Springwater Corridor

Portland · Multnomah County · trail · easy · 0.14 mi · Hard Surface

Photo of Springwater Corridor

Visit

Best for

  • Seniors

Search to see a fit score for your needs.

Compare nearby

Essentials

At a glance

Published hours and a quick amenity skim — confirm on the official page before you go.

On site

Visitor amenities

Grouped from public park records — confidence may vary by source.

…stay a while

  • Restroomfacility
  • Picnic Areafacility
  • Accessible Featuresfacility

…be in nature

  • Trailnature
  • Vista Pointnature
  • Horse Trailsnature
  • Bike Pathnature
  • Hiking Trailsnature

…near water

  • River Accesswater

Trail map

Mapped route from open trail GIS (simplified for the web).

Loading map…

On the ground

Trail facts

Stats from open trail GIS when available — verify conditions before you go.
Difficulty
easy
Length
0.14 mi
Surface
Hard Surface

Overview

About this park

Trail Closure SE Dee Street and SE Haley Road Starting September 8, 2026, the Springwater Corridor Trail will be closed between Boring Station Park (SE Dee St) and SE Haley Rd and is anticipated to continue through November 2026.

A-frame closure signs will be placed at either end of the closed section. A shuttle will be available for the approximately ¾ mile detour route.

The shuttle vehicle will operate continuously between the closure points during work hours (Mon-Fri, 7 a. m. to 5 p. m. ).

The shuttle will be capable of transporting 8-10 passengers with a rack for bicycles and mobility devices (wheelchairs, scooters). Estimated wait times are 5-10 minutes.

For more information, please visit PGE's project webpage

Things to do

Things to do

The trail will be completely closed between these two points during construction (Mon-Fri, 7 a. m. to 5 p. m. ).

A-frame signs will designate the shuttle stops at either end of the closure. A shuttle vehicle will transport trail users around the work zone from closure point to closure point.

Background

History & notes

The Springwater Corridor is a former rail corridor; the Springwater Division Line was developed for rail service in 1903. By 1906, under a joint ownership with Portland General Electric and the Portland Railway Light and Power Company, the line reached its peak usage. By 1910, the company had six electric plants and 161 miles of rail, carrying 16,000 passengers each year on a citywide system. In addition to passengers, the rail hauled farm produce to Portland markets. It was at this time it acquired the name Springwater Line, probably because of the planned connection to the community of Springwater on the Clackamas River. It was also known as the Portland Traction Company Line, the Cazadero Line, and the Bellrose Line. Many communities developed along the Springwater Line including Sellwood, Waverley Heights, Eastmoreland, Woodstock, Errol Heights, Lents, Powellhurst-Gilbert, and Pleasant Valley. Towns that developed along the line include Milwaukie, Gresham, Boring, Eagle Creek, Estacada, and Cazadero. During the peak of the railroad era, the Springwater Line was the linkage between these communities. To encourage weekend use, the rail corporation developed destination parks along the line such as Oaks Amusement Park on the banks of the Willamette River in Sellwood. These parks became major attractions, drawing thousands of passengers each weekend. Passenger service was discontinued in 1958. Much of Springwater Corridor was acquired by the City of Portland in 1990, with additional acquisitions by Metro in the following years. Master planning for the Corridor began in 1991 and included input from community members, agencies, organizations, and municipalities, including Portland Department of Transportation; Oregon Department of Transportation; the cities of Gresham and Milwaukie; Metro; Clackamas and Multnomah counties; the 40 Mile Loop Land Trust; and the Johnson Creek Corridor Committee. Construction of the initial Portland segment was completed in September 1996. The trail through Gresham was built in 1996 and an additional mile east of Gresham was built in 2000. With the completion of a 3-mile segment from SE Ivon to SE Umatilla Streets (known as Springwater on the Willamette) in 2005, the part of the trail within Portland is nearly complete. In 2019, thanks to funding from the Parks Replacement Bond , Bridge #48 near the Johnson Creek Boulevard trailhead at SE 45th Avenue and Johnson Creek Boulevard was replaced, and Bridge #140 near Circle Avenue received new decking.

Today

Check conditions before you go

Weather

Loading forecast…

Forecast is advisory — confirm park hours before you go.

Getting there

SE Ivon Street to Boring, Oregon Portland, OR
Compare parks

Nearby

More parks in Portland

Nearby options if this one isn’t the right fit.

Data quality

Sources

Check the official source for current hours and closures. Amenities are from public park records and may change seasonally. The agency page remains the source of record.

Confidence checks: coordinates · website · image · hours · amenities (and last verified when known).

Confidence score

100/ 100

Portland Parks Website

  • official website
  • coordinates
  • amenities
  • hours
  • image
  • last verified

Unknown statuses are not treated as open.

Oregon Outdoor AtlasOregonOutdoor Atlas

Explore More. Discover Oregon.

Discover Oregon's parks, trails, waterfalls, lakes, beaches, and campgrounds. Explore outdoor destinations, plan your next adventure, and share your experiences.

Always verify hours, fees, fire restrictions, and access with the managing agency before you go.

© 2026 Oregon Outdoor AtlasAll rights reserved.

Built for Oregon outdoor exploration — not affiliated with any land management agency.